Free van build cost estimator

What might your van build cost?

Pick your van, who does the work, and the systems you want. You’ll get an itemized parts list with a low-to-high range, plus labor in hours or dollars. Every price is an example you can change.

Free to useNo signupMade for the road
01 / Your build

Pick a van and your systems.

Every price is an editable example from a public listing or a published build. Check current prices before you buy.

Who does the work?
Units
01Your vehicle

The inside size sets how much insulation, paneling and flooring you need.

Mercedes-Benz Sprinter, 144″ WB · High roof (2019+)Inside: 11′ 1″ long × 5′ 10″ wide × 6′ 7″ tall. About 65 sq ft of floor and 249 sq ft of walls and ceiling to cover.

02Systems

Choose what goes in. Each choice adds its parts to the list below.

Use 0 if your van already has the windows you want.
A roof fan moves air and moisture out.
03Labor and extras

Hours come from one couple’s published build log. Pick a speed that fits you.

Saws, drills and clamps you don’t own yet.
Awning, swivel seats, roof rack, shower walls.
Optional. Leave at 0 to see the build alone.
Change the example prices

These are example prices from the listings named under each item, checked November 2026. Prices change, so check current prices and put in your own.

Insulation (Thinsulate-type)

USD 12 per 5 sq ft roll foot; FarOutRide paid USD 1,050 for about 319 sq ft of walls and ceiling. Source: 3M Thinsulate SM600L, FarOutRide.

Wall and ceiling panels (1/4 in plywood)

USD 36.94 a sheet, ±25%. Cedar or upholstered panels cost more. Source: 1/4 in × 4 × 8 ft sanded ACX plywood.

Subfloor and flooring

FarOutRide’s two floors: USD 565 and USD 1,225 for about 84 sq ft. Source: FarOutRide.

Windows

Van Windows Direct and CRL listings. Source: CRL Sprinter T-vent window USD 737.20.

Roof fans

FarOutRide paid USD 360; MaxxFan Deluxe listed at USD 475.35. Source: FarOutRide, MaxxAir MaxxFan Deluxe 7500K roof fan.

Lithium (LiFePO4) batteries, 100 Ah each

LiTime and Battle Born list prices. Source: LiTime 12V 100Ah LiFePO4 battery, Battle Born 100Ah 12V LiFePO4 battery.

Solar panels, 200 W each

Rich Solar 200 W: sale and regular price at one retailer. Source: Rich Solar 200 W 12V panel.

Solar charge controller

FarOutRide paid USD 225, ±25%. Source: FarOutRide.

DC-DC charger (charges from the engine)

Renogy 40A list price; FarOutRide paid USD 400. Source: Renogy 40A DC-DC charger with MPPT, FarOutRide.

Inverter, 2,000 to 3,000 W

Renogy 2000 W inverter to a Victron MultiPlus 3000 inverter-charger. Source: Renogy 2000W 12V pure sine inverter, Victron MultiPlus 12/3000/120 inverter-charger.

Battery monitor

Victron SmartShunt; FarOutRide paid USD 205. Source: Victron SmartShunt 500A battery monitor, FarOutRide.

Wire, fuses, breakers and switches

FarOutRide paid USD 600 for a mid-size system, ±25%. Source: FarOutRide.

Water tank, pump, sink, faucet and plumbing

FarOutRide’s water system, USD 1,100, ±25%. Source: FarOutRide.

Fuel-fired air heater (diesel or gasoline)

FarOutRide’s Webasto (USD 1,300) and Espar (USD 1,650). Source: FarOutRide.

Cassette toilet

Thetford Porta Potti 365 at USD 174.68, ±25%. Source: Thetford Porta Potti 365 cassette toilet.

Mattress

Foam mattress to a van-specific mattress. Source: Zinus 6 in memory foam mattress (full), Flatline Van Co Sprinter van mattress.

Bed platform with storage under

FarOutRide’s two bed platforms. Source: FarOutRide.

12V fridge, 30 to 45 liters

BougeRV 30 qt to Dometic CFX3 45. Source: BougeRV 30 quart 12V fridge, Dometic CFX3 45 powered cooler.

Portable stove

Iwatani 35FW at USD 129.99, ±25%. Source: Iwatani 35FW portable butane stove.

Sink and stove cabinet with counter

FarOutRide’s cabinet materials, USD 280, ±25%. Source: FarOutRide.

Fridge and electrical cabinet

FarOutRide, USD 230, ±25%. Source: FarOutRide.

DIY estimateUSD 9,314–13,349

See details ↓
03 / Itemized

Your parts list.

Parts in USD, using the budget-to-middle half of each example price range. Hours are the listed hours.
ItemPartsHours
Insulation, walls and floor1,284–1,73569
Insulation (Thinsulate-type)249 sq ft × 2.40–2.85598–710
Wall and ceiling panels (1/4 in plywood)9 sheets × 28–37249–333
Subfloor and flooring65 sq ft × 6.73–10.66437–693
Windows and fans1,560–1,75516
Windows2 × 600–6691,200–1,337
Roof fans1 × 360–418360–418
Electrical2,415–4,09486
Lithium (LiFePO4) batteries, 100 Ah each2 × 360–654720–1,309
Solar panels, 200 W each2 × 199–284398–569
Solar charge controller1 × 169–225169–225
DC-DC charger (charges from the engine)1 × 206–303206–303
Inverter, 2,000 to 3,000 W1 × 372–935372–935
Battery monitor1 × 100–153100–153
Wire, fuses, breakers and switches1 set × 450–600450–600
Water825–1,10040
Water tank, pump, sink, faucet and plumbing1 set × 825–1,100825–1,100
Heat1,300–1,47530
Fuel-fired air heater (diesel or gasoline)1 × 1,300–1,4751,300–1,475
Bathroom131–1751
Cassette toilet1 × 131–175131–175
Bed605–1,13020
Mattress1 × 155–522155–522
Bed platform with storage under1 × 450–608450–608
Kitchen (galley)750–1,25070
12V fridge, 30 to 45 liters1 × 270–610270–610
Portable stove1 × 97–13097–130
Sink and stove cabinet with counter1 × 210–280210–280
Fridge and electrical cabinet1 × 173–230173–230
Parts total8,870–12,714332

How much does a camper van conversion cost?

Mostly it depends on three things: how big the van is, which systems you add, and who does the work. A DIY build trades money for hundreds of hours. A professional build adds paid labor. This estimator puts example parts prices and published hours together so you can see where the money goes. It isn’t a quote, and the van itself isn’t included unless you add it.

How the estimate works

  • Floor area = inside length × inside width. Walls and ceiling = 2 × length × height + length × width + width × height (both sides, the ceiling and the rear). Windows aren’t subtracted.
  • Insulation and flooring are priced per square foot. Wall panels = walls and ceiling × 1.15 for waste ÷ 32 sq ft per 4 × 8 sheet, rounded up.
  • Each item has a budget and a premium example price. Where we found two listings, they’re the two ends. Where we found one, the range is that price −25% to +25%.
  • DIY uses the budget-to-middle half of each range. Mid-range and professional builds use the middle-to-premium half.
  • Fasteners, glue, sealant and finishes = 5% of parts. That’s FarOutRide’s “Others” line (USD 850 of USD 20,150, about 4.2%), rounded up.
  • Labor: DIY shows your hours. Mid-range pays for the electrical and heater hours at your shop rate. Professional = all hours × shop rate. The USD 100 an hour starting rate is only an example; ask local builders.
  • Total = parts + 5% small parts + paid labor + tools + anything else + the van’s price if you add it.

Where the hours come from

FarOutRide published the hours they logged building out a 2016 Ford Transit 148″ EL high roof. We use their figures for insulation (20 h, scaled to your wall area), flooring (30 h, scaled to your floor area), roof fans (8 h each), a mid-size electrical system (86 h), the water system (40 h), a fuel-fired heater (30 h), a propane heater (8 h) and propane system (40 h), a composting toilet (20 h), a bed platform (20 h) and cabinets (30 to 40 h each). Wall paneling (0.12 h per sq ft), windows (4 h each), basic and big electrical (40 h and 120 h), hot water (8 h), a cassette toilet (1 h), a shower pan (40 h), jugs (1 h), a simple or convertible bed (2 h and 30 h) and a table (8 h) are RME planning allowances, not measured figures. FarOutRide logged 640 hours in total and say the real number was closer to 1,000, so a first build may take longer. The speed you pick changes only the hours you do yourself; paid shop hours use the listed hours.

What isn’t included?

The van, sales tax, shipping, mistakes, tool rental, shore-power wiring, swivel seats, awnings, roof racks, shower walls and grey tanks aren’t included unless you add them under “Anything else”. Professional shops price builds their own way and often add a margin on parts; this tool doesn’t claim to show any shop’s price. Get written quotes for a real build.

Safety

Propane, fuel-fired heaters and 120-volt wiring can cause fires or carbon monoxide poisoning if installed wrong. Follow the maker’s instructions, fit smoke, CO and propane alarms, and use a qualified installer if you’re unsure. In the US, RV propane and fuel-burning appliances are covered by NFPA 1192, and RV electrical wiring by NFPA 70 (the National Electrical Code) Article 551.

Sources

Prices were checked on November 1, 2026. Listings change, so check current prices.

The plan is just the beginning

Find places. Meet your people.

Use RME to discover road essentials, connect with travelers and keep a map of your journeys.